Postern built with the contribution of the ROP

In 2016 it will be five years since the reconstruction of the Postern, for which we received a subsidy from the Regional Operational Program of Central Moravia. The photos show how impressive the work is. The length of the corridor (Postern) is 64 metres.

2018-08-17T05:58:54+00:00 20.5.2016|